
Furniture Removal and Floor Prep.















Previous Floor Was Put On With Tape. There was a lot of prep needed to remove the adhesive.















Floor was water damaged. Wood was removed, replaced, insulated and leak was addressed.













Vinyl Plank Flooring (LVP) installation.

















Bed was made a bit larger and pistons were replaced. Carpet for under bed storage was replaced as well as on the bed surface. Drawers were repaired and bed was realigned.















Booth/Dinette reconstruction and reupholstery.



































Sofa reupholstery and adjustment.
















Misc reference photos for communication with customer.









