
Tear out



















Floating the floor













Spreading the glue


Installing the vinyl plank flooring (lvp) and caulking
















Custom trim milling, finishing, and installing













Booth (dinette) bottom was rebuilt and redesigned to accommodate the new flooring.

















Rebuild battery cover to align with new flooring.





Entry Steps rebuild. We almost always have to rebuild the steps because they are often not square and damaged from removing old material.








Front TV Cabinet build for new TV






















