Sheppard – 2009 Gulf Stream Cresenda 40′

Installation of shelving in bedroom closet. Installation of fireplace in galley area. Remove old caulk from all sliderooms and reseal. Removal ceramic tile. Removal carpet. Overlay existing floor w/Luan and vinylplank flooring installed. Replace Bedroom, Hall, Galley TVs. Install NEO strip for driver side slide room. Remove & Replace driver & passenger seats.